Stress Test Report
Stress Test Report
Stress Test of Remote Signing and Validation
The stress test was executed on High Availability setup consisted of a load balancer that was sharing the requests between two machines. The Remote Signing and Validation of pdf document were tested, and the duration of stress test was 15 minutes.
Signing Test Plan
Below the test plan of Remote Signing endpoint is presented. In the following graph, we can see the number of active threads over time.
Validation Test Plan
Below the test plan of Validation endpoint is presented. In the following graph, we can see the number of active threads over time.
Stress Test Results
The above test plans were executed by two clients simultaneously. You can find below the results of the described testing process.
Stress Test of Remote Signing Detached
The stress test was executed on High Availability setup consisted of a load balancer that was sharing the requests between two machines. The Remote Signing Detached of pdf document was tested, and the duration of stress test was 27 minutes.
Signing Detached Test Plan
Below the test plan of Remote Signing Detached endpoint is presented. In the following graph, we can see the number of active threads over time.
Stress Test Results
The above test plan was executed by one client. You can find below the results of the described testing process.